Ionic DeZign Studios
  • Home
  • Projects
    • Restaurants
    • Worship
    • Retail
    • Car Washes
    • Health and Wellness
    • Offices
    • Interior DeZign
  • Our Approach
    • IONIC Overview
  • About IONIC
  • Our Team
  • News & Articles
  • Contact
  • Careers
  • Menu Menu
  • Link to Facebook
  • Link to Instagram
  • Link to LinkedIn
  • Link to X
  • Link to Youtube

Tag Archive for: electrical

Ask IONIC #4 – MEP Services

March 20, 2019/in Ask Ionic, Inside IONIC

Ask IONIC is a napkin series of questions that we often hear from our client and others that may assist those who are also seeking answers.

No question is dumb… just the ones you don’t ask.

We hope these will help you understand our industry just a little better so you can make informed decisions on your project.

Information that leads to knowledge is the key to success.

Are Mechanical, Electrical and Plumbing Engineered drawings required for my Project?

We often get questions not only from our clients but also from general contractors about engineering requirements for projects. MEP stands for mechanical, electrical and plumbing.

In most jurisdictions, any modifications to an existing facility where the mechanical, electrical or plumbing will be altered, the jurisdiction requires engineered drawings. This is also applicable to any new construction. In some cases, again depending on where you live, the jurisdiction will allow drawings that are either unsealed or sealed by a licensed architect. The drawings need to explain in detail all the requirements of these engineering scopes.

Although IONIC is not an engineer in these trades, we often incorporate within our scope of work the hiring of engineering consultants to help facilitate this need. This is the easiest and most complete way to organize a set of documents without confusion. All of our CADD files and Revit files can be shared with the engineering firm of record to make sure all of the work is coordinated and matched for continuity.

Here is a list of typical services:

Mechanical Engineering and HVAC Design:

Heating, Ventilating, and Air Conditioning Systems (HVAC)

Central Plant Design

Exhaust Systems

Direct Digital Control (DDC) Systems

Chilled Water Systems

Heating Water Systems

Ground Source Heat Pump Systems

Outside Air Pretreatment and Dehumidification

Pool Dehumidification

Lab Fume Hood Systems

Energy Recovery Systems

Electrical Engineering Design

Power Distribution Systems

Interior and Exterior

Lighting Design

Photometric Analysis

Lightning Protection Systems

Fire Alarm Systems

Outlets and Raceway Systems for Voice and Data

Backup Power Generators

Uninterruptible Power Supplies (UPS’s)

Dimming Systems

Special Grounding Systems

Plumbing Systems Design

Domestic Cold and Hot Water Systems

Domestic Waste and Vent Systems

Fuel Gas Piping Systems

Storm Water Systems

Fixture Unit Analysis Calculations

Performance Specification of Automatic Sprinkler Systems

Lab Gas Systems

Medical Gas Systems

Compressed air systems

Vacuum Systems

Grease Interceptors

A common phrase in our industry is design build. We have previously written about this definition and the buried understandings of what design build entails. In short, many times the general contractor will hire the trades for mechanical, electrical and plumbing to produce the minimal amount of documents needed to obtain a permit for their scopes of work. We have seen all ranges of how this can be accomplished.

In some areas we have seen the trades hire an engineer to produce their work. We have also seen the trades do line drawings on top of our architectural to obtain a permit. And yes, we have even seen napkin sketches get approved for the minimal amount of scope that might be needed in a smaller project. Some jurisdictions do not require any documents whatsoever just the application noting that most or all of this work will be verified in the field and inspected by the jurisdiction or a third party ensuring that all is done properly and to code.

Owners would often look at this as an opportunity to save money.

This is true as the owner will spend less money on engineering upfront. However it is possible that they might spend more on construction because the trades will need to do this extra step to obtain their permits. The cost of construction in each of these areas might increase. However, that is not always the case. Most likely what does occur is the general contractor selects a competent subcontractor that can do this work and utilizes their skills and experience as well as a long-lasting relationship to establish a team on the project. As long as the subcontractors are pricing this competitively, IONIC does not see a disadvantage to this. However the owner must be very cautious in making sure that the bids and scope of work are apples to apples.

For instance, one subcontractor for the mechanical might propose only 8 tons of heating and cooling whereas another subcontractor might review the conditions and consider that 10 tons are required. Less is not always the right choice, and neither is more.

It needs to be calculated properly according to the needs of the space in the occupancy determined.

By going this route, it also eliminates competitive bids by all the subcontractors of the trade. It might be beneficial to have all the engineering documents so that multiple subcontractors can price the work not only for value but also for time availability.

This could be very important to the schedule of the construction.

Either choice is acceptable as long as the jurisdiction allows it. The owner must know the conditions of the permit requirements for their specific jurisdiction before proceeding with any one option.

Ask your architect what is required and what is the best scenario for your specific project. 

If you are exploring this opportunity, IONIC suggests that you reach out to us and we can quickly provide some useful information for your project.

Hope this clarifies the question for you. Should you have others, please submit them to us and we will add them to the list and post answers. Feel free to contact us.

We look forward to hearing from you.

https://ionicdezigns.com/wp-content/uploads/2020/11/Ask-IONIC.jpg 618 800 r2rmarkets https://ionicdezigns.com/wp-content/uploads/2020/10/Ionic-Logo_Hi-res-340.jpg r2rmarkets2019-03-20 12:42:142023-02-02 19:09:38Ask IONIC #4 – MEP Services
Search Search

Recent Posts

  • Beyond the Metal Box: The Possibilities of Pre-Engineered Metal Buildings
  • A Summer of Learning, Creativity, and Community: Carly’s Experience at IONIC
  • Eugene shares his honest take on social media.
  • Should You Renovate Your Office or Start Over?
  • Building Community, One Space at a Time

Categories

  • Ask Ionic
  • Design Features
  • In The News
  • Inside IONIC
  • Looking Back
  • News
  • One-Minute Mile
  • Reflections
  • Uncategorized
  • Weekly Roundup
  • Work In Progress Series
  • Worship

Archives

  • October 2026
  • September 2026
  • August 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • November 2025
  • October 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • March 2023
  • February 2023
  • September 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • February 2022
  • January 2022
  • December 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • November 2020
  • October 2020
  • August 2020
  • July 2020
  • October 2019
  • September 2019
  • July 2019
  • June 2019
  • April 2019
  • March 2019
  • January 2019
  • December 2018
  • November 2018
  • June 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017

Virginia Beach Office
293 Independence Blvd.
Building 5, Suite 308
Virginia Beach, VA 23462
757-499-3510

“We take great pride in the philosophy that our deZigns create projects that become Art You Can Walk Through.”

– Eugene Thompson, IONIC President and Founder

Ionic DeZign Studios, Inc.
© Copyright - Ionic DeZsign Studios | Website by R2R Marketing
  • Link to Facebook
  • Link to Instagram
  • Link to LinkedIn
  • Link to X
  • Link to Youtube
  • IIDA
  • AIA
  • ASID
  • USGBC
  • CSI Resources
  • VDHA
Scroll to top Scroll to top Scroll to top

This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

Accept settingsHide notification onlySettings

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Privacy Policy
Accept settingsHide notification only